News releases from Ni-Co Energy Inc. (TSXV: NICE), with the drill intercepts, financings and disclosure checks the screen reads from them. One release since 19 Nov 2026; latest 19 Nov 2026.
- Releases
- 1
- Drill results
- 1
- Disclosure checks stated
- 0 of 4 (1 technical release)
- Commodities
- nickel, copper, cobalt
Drill results
Best reported: 4.60 metres grading 0.59% (2.7 %·m, 19 Nov 2026) · 1.75 metres grading 1.06% Ni (1.9 %·m, 19 Nov 2026). Grade × length as the release reports it; lengths are usually down-hole.
| Date | Release | Intercepts | Best grade × length | Disclosure |
|---|---|---|---|---|
| 19 Nov 2026 | Ni-Co Energy Reports 4.60 Metres at 0.59% Nickel at Kremer-2; Phase-One Drilling Advances Magmatic Sulphide Exploration Model | 4.60 metres grading 0.59% 1.75 metres grading 1.06% Ni | 2.7 %·m | True width: not stated Lab + QP: not stated QA/QC: not stated Cut-off: not stated |
All releases
Ni-Co Energy Reports 4.60 Metres at 0.59% Nickel at Kremer-2; Phase-One Drilling Advances Magmatic Sulphide Exploration Model
0 of 4 disclosure checks stated True width: not stated Lab + QP: not stated QA/QC: not stated Cut-off: not statedIntercepts: 4.60 metres grading 0.59% · 1.75 metres grading 1.06% Ni
Source: TMX Newsfile
History starts on 27 October 2026, when this screen began collecting; earlier releases are on the company’s own site and on SEDAR+ or EDGAR. All companies · Latest mining news
Releases are collected automatically from TMX Newsfile and SEC EDGAR. Types, figures and the disclosure checklist are extracted by software and can be wrong: open the original release before relying on them. The checklist shows what a technical release states (true width, laboratory and qualified person, QA/QC, cut-off and compositing, resource categories, whether historic estimates are labelled); it is not a judgement of the project or the company. Not investment advice.