News releases from Collective Mining Ltd., with the drill intercepts, financings and disclosure checks the screen reads from them. 3 releases since 3 Nov 2026; latest 12 Nov 2026.
- Releases
- 3
- Drill results
- 2
- Disclosure checks stated
- 2 of 8 (2 technical releases)
- Commodities
- gold, silver, tungsten, copper
- Places
- Colombia
Drill results
Best reported: 154.30 m at 12.66 g/t AuEq (1,953.4 g·m, 10 Nov 2026) · 83.75 m @ 21.14 g/t Au (1,770.5 g·m, 3 Nov 2026). Grade × length as the release reports it; lengths are usually down-hole.
| Date | Release | Intercepts | Best grade × length | Disclosure |
|---|---|---|---|---|
| 10 Nov 2026 | DATED NOVEMBER 10, 2026 Exhibit 99.1 Collective Mining Expands the Ramp Zone in Multiple Directions, More Than Doubling Its Vertical Extent, and Drills 21.40 m at 11.06 g/t AuEq* | 154.30 m at 12.66 g/t AuEq 44.55 m @ 5.75 g/t AuEq 21.40 m @ 11.06 g/t AuEq | 1,953.4 g·m | True width: stated Lab + QP: partly stated QA/QC: partly stated Cut-off: partly stated |
| 3 Nov 2026 | DATED NOVEMBER 03, 2026 Exhibit 99.1 Collective Mining Drills 154.30 m @ 12.66 g/t AuEq*, Including 30.45 m @ 39.01 g/t AuEq*, at Apollo's Ramp Zone | 154.30 m @ 12.66 g/t AuEq 83.75 m @ 21.14 g/t Au 30.45 m @ 39.01 g/t AuEq | 1,953.4 g·m | True width: stated Lab + QP: partly stated QA/QC: partly stated Cut-off: partly stated |
All releases
INTERIM FINANCIAL STATEMENTS Exhibit 99.1 UNAUDITED INTERIM CONDENSED CONSOLIDATED FINANCIAL STATEMENTS For the three and nine months ended
Source: SEC EDGAR
DATED NOVEMBER 10, 2026 Exhibit 99.1 Collective Mining Expands the Ramp Zone in Multiple Directions, More Than Doubling Its Vertical Extent, and Drills 21.40 m at 11.06 g/t AuEq*
1 of 4 disclosure checks stated True width: stated Lab + QP: partly stated QA/QC: partly stated Cut-off: partly statedIntercepts: 154.30 m at 12.66 g/t AuEq · 44.55 m @ 5.75 g/t AuEq · 21.40 m @ 11.06 g/t AuEq
Source: SEC EDGAR
DATED NOVEMBER 03, 2026 Exhibit 99.1 Collective Mining Drills 154.30 m @ 12.66 g/t AuEq*, Including 30.45 m @ 39.01 g/t AuEq*, at Apollo's Ramp Zone
1 of 4 disclosure checks stated True width: stated Lab + QP: partly stated QA/QC: partly stated Cut-off: partly statedIntercepts: 154.30 m @ 12.66 g/t AuEq · 83.75 m @ 21.14 g/t Au · 30.45 m @ 39.01 g/t AuEq
Source: SEC EDGAR
History starts on 27 October 2026, when this screen began collecting; earlier releases are on the company’s own site and on SEDAR+ or EDGAR. All companies · Latest mining news
Releases are collected automatically from TMX Newsfile and SEC EDGAR. Types, figures and the disclosure checklist are extracted by software and can be wrong: open the original release before relying on them. The checklist shows what a technical release states (true width, laboratory and qualified person, QA/QC, cut-off and compositing, resource categories, whether historic estimates are labelled); it is not a judgement of the project or the company. Not investment advice.